Our Solutions

Save 30% to 90% of your electricity bill

With the rising energy costs, and limited resources, the future of energy looks bleak, but thanks to the renewable sources of energy and the advancement in sciences, we can prepare and hedge against the negatives now. Solar energy offers independence and security to homes and business, eliminating the power outages, voltage fluctuations that damage equipment and appliances, as well as prevarication against hikes in prices, reducing dependency on imported fuels.

We offer custom made, tailored Residential and Commercial Grid-tied as well as Off Grid solutions based on your energy needs as well as your budget. Our solutions can be set up in less than 45 days. Our competitive edge lies in expert knowledge, and access to cutting edge top of the line technology.

You can step into the future of energy with just 5 simple steps:
1.    Site Survey

Before the submission of the final proposal, a site survey is done to collect information about local conditions. Analyzing the condition of rooftop, determining a suitable condition for rooftop as well as maintenance and installation concerns. Conducting a shadow analysis and determining the location of system components such as inverters, combiner box, and distribution boxes etc. It is also done to determine the energy needs of the business.

2.    Design

After acquiring information from the site survey, a fully detailed technical and financial proposal is presented based on the requirements of the client. In this proposal, we design the type and number of modules, along with inverter type, wiring requirement, tilts, azimuth and convey total expected savings and return on investment.

2.    Design

After acquiring information from the site survey, a fully detailed technical and financial proposal is presented based on the requirements of the client. In this proposal, we design the type and number of modules, along with inverter type, wiring requirement, tilts, azimuth and convey total expected savings and return on investment.

3.    Execution of the project

After obtaining the necessary approvals and chalking out the scope of the project, the set up can be installed in very little time. It involves, installation of inverter, batteries, modules and wiring setup.

4.    Inspection and testing

In this phase, AC and DC loads are checked for end to end continuity as well as carrying out the checks on wiring resistance. This phase usually lasts for 1 week during which various performance assessments are carried out.

4.    Inspection and testing

In this phase, AC and DC loads are checked for end to end continuity as well as carrying out the checks on wiring resistance. This phase usually lasts for 1 week during which various performance assessments are carried out.

5.    Monitoring and maintenance

All troubleshooting requests are met in the least amount of time possible.  Monthly cleaning cycles are carried out to make sure the modules operate optimally. (Maintenance contract)